Case Studies
DEKOMTE de Temple offer innovative and quality expansion joint solutions to bring reliability of operation in the applications they are installed. Typical applications are industrial incinerators and annealing furnaces, power plants, steel plants, petrochemical installations, pyrolysis and precipitators, HVAC, food industry and also the fire-proofing of wall penetrations.
Explore, in depth, some of our case studies and projects below:
CCGT Power Plant – HRSG Side Wall Penetration Seal Retrofit in Spain
Originally built as a baseload power station, Cartagena’s operating equipment is not designed for high cycling. DEKOMTE proposed a bolted collar fabric expansion joint solution, that integrates to the HRSG cold casing and maintains a high cyclic capability, gas sealing penetration seal.
CCGT Power Plant – HRSG Combination Side Wall Penetration Seal in Poland
The original design consisted of three independent penetration seals within close proximity to each other, whereas the new design focuses on the insulation integrity in the casing and around each nozzle in a staggered penetration seal design.
Conventional Coal Power Plant – Ash Hopper Fabric Retrofit in the USA
The Springerville ash hopper dipper trough was upgraded with a DEKOMTE dry seal expansion joint retrofit, incorporating a new drip shield, flow plate, fabric joint, backing bars and inlet & outlet frames.
V94.2 CCGT Power Plant – GT Exhaust Metal Bellow to Fabric Retrofit in Wales
The replacement and upgrade of the existing metallic expansion joint with another metal expansion joint would have required a full NDT, splicing in new section of bellow and extremely delicate welding. Alternatively, a fabric expansion joint retrofit boasted multiple advantages…
GT26 CCGT Power Plant – HRSG Casing Pumpable Hotspot Repair in Ireland
Whilst regular insulation repairs and maintenance can be intrusive, laborious and time-consuming, pumpable insulation lowers cost and shortens downtime.
GE 9FA CCGT Power Plant – HRSG Inlet High Cycling Expansion Joint in Wales
The complex frame geometry at the heart of the solution gives low fatigue stress from the thermal transients caused during cycling.
Make contact today to help you choose the right solution