Design Analysis
Design Validation by CFD and FEA
FEA is extremely valuable in evaluating failures or tasks in more complex plants or in construction systems with unknown operating conditions. It is very helpful for the plant operator but also for the expansion joint manufacturer to carry out flow calculations (CFD) and thermal analyses (FEA/FEM). This technology allows to analyse the plant construction and to have an effect against the actual physical difficulties in a focused way.

Expansion Joint Integration into Pipe and Ducting Systems
To evaluate a project in total we understand it as our task to consider the constructional situation of each plant from the beginning. The feasibility of an installation and the transport within the plant is strongly influenced by the design and methods of transportation and have to be considered for the sake of a cost saving and logistically realizable procedure. Under consideration of a logical, conclusive and cost-effective solution this coherence must not be neglected.
















